JHR - CEA CADARACHE

High Safety cranes

CONTEXT

To the JULES HOROWITZ (RJH) experimental reactor on the CEA CADARACHE center, COMETE has built the EML, EMZ and EMP high safety cranes. JOSEPH PARIS, in a consortium with COMETE for this project, has realized the polar bridge.

2 high safety cranes level 1
2 high safety cranes of 45T and 25T
1 high safety crane level 2
1 crane of 0.5T with a telescopic platform
1 polar crane
Polar crane of 45T and diameter of 34m

RJH

1/8
2/8
3/8
4/8
5/8
6/8
7/8
8/8
8 pictures

Works done

  • Mechanical and Electric studies
  • Manufacturing
  • Assembly in factory
  • Tests in factory
  • Assembly on site
  • Tests in site and commissioning