You have arrived on the English website.

Pont de Marinage Dunkerque

Pont de Marinage Dunkerque
COMETE designed, manufactured and started a specific crane for the extraction of dump trucks from the digging of the Dunkirk LNG terminal's hydraulic gallery.
This semi-automatic secure bridge with a capacity of 20 tons has been designed to withstand the requirements of a shipyard exposed to bad weather and marine aggression. Its high performance and innovative dump system will ensure compliance with the rates imposed by the tunnel boring machine piloted by the RAZEL-BESSAC group.